Construction & restoration

Site cleaning during construction and renovation

A clean site is a safer and faster site. We schedule our visits in consultation with the site manager, so that the next team can start on a clear, low-dust surface.

Making a concrete floor dust-free before spraying PUR insulation

Who it is for and what they need

  • Contractors and site managers who want a clean, safe workplace between two phases.
  • Property developers with several residential units being finished.
  • Insulation companies that need a dust-free subfloor for spraying PUR (polyurethane) insulation.
  • Renovations in occupied or partly occupied buildings.

What is included

Periodic site cleaning

  • Sweeping and vacuuming floors and stairs
  • Clearing walkways and passages
  • Cleaning the site cabin or temporary welfare facilities by arrangement

Preparation for PUR insulation

  • Making subfloors completely dust-free with an industrial vacuum cleaner
  • Removing loose debris, mortar and tape
  • Checking corners and edges

Waste

  • Collecting site waste that falls within our job
  • Sorting according to the site’s waste streams
  • Taking it to the skips or the recycling centre as agreed

Optional extras

  • Interim window cleaning
  • Photo report for each visit
  • Handover cleaning at the end of the project

How it works

  1. 01

    Site visit

    We look at the phasing, access, safety rules and the site’s waste streams.

  2. 02

    Coordination with the site manager

    Visits are scheduled around the next steps, for example the day before the PUR is sprayed.

  3. 03

    Working safely

    With the appropriate personal protective equipment and in line with the site rules.

  4. 04

    Reporting

    We immediately report any irregularities or damage we notice, with a photo on request.

What determines the price

Every job is different. These factors determine the price in your quote:

Request a no-obligation quote
  • 1Floor area and number of floors
  • 2Frequency and timing of visits
  • 3Amount and type of waste
  • 4Accessibility (lift, stairs, site crane)
  • 5Site safety requirements

Frequently asked questions

Can you make a floor dust-free for PUR at short notice?

We do our best to fit in with your schedule. Let us know the spraying date as early as possible and we will schedule the visit just before it.

Do you take away all the site waste?

We collect and sort the waste that falls within our job. Large quantities of rubble or specific waste are discussed in advance and included separately in the quote.

Request a quote for construction site cleaning during works

Tell us what you need. You will receive a tailored quote, with no obligation.

Request a quote